What it is a Hofhouse?
      Standard Homes
      Traditional Construction
      Renovation & Extentions
      Arquitecture
      Technical Details
      Surrounding
      Interior
      Gallery
      Showhouse
      Contacts
Share |
« Back

Another major bonus that Timber Frame Houses offer is the minimal construction time, in many cases being of just a few months.

Even though designs are customized for each individual client, a number of basic models are available, to speed up the process even more. The required time for the whole building amounts to approximately 4 - 5 month. The basic, water tide construction is done in approximately 2 weeks. 

 

Insulation materials are sandwiched between a thick, solid wood frame to provide the best possible thermal, acoustical and structural benefits.

To protect the used wood it from parasites it’s technically treated to extract any resin or proteins.

Fire and sound protection are fully in line with the legal regulations in accordance with European laws (F 30) and the fire resistance duration of the materials used.

Constrution Details

 Advantages »   


Neteuro © 2010

  
HofHouse - Portugal - Construção
  Rua Moinheta, 32 - 8365-062 Algoz
Alvará nº 64679